NEWS

1 2 3 4
01.11.2014
PLINFA Company will be taking part in “MosBuild 2015” exhibition
The group of companies «PLINFA» will take part in exhibition “Building Materials & Equipment” under project “MosBuild 2015", which will be held in Moscow "Expo Centre" from April 14th till April 17th, 2015.
18.09.2014
Advance equipment - mixer with a grill PL 250 - was put into operation at «Tomsk ceramsite plant»
Engineering-industrial group «PLINFA» pays much attention to reconstruction of ceramsite production. At present time, modernization projects are conducted and pre-design concepts are developed for some ceramsite plants. We are ready to offer solutions for charge material processing and pellets forming, as well as to supply equipment for pellets drying.
27.08.2014
PLINFA Group Completes a Complex Project for the Modernization of Tula Brick Factory
PLINFA Group has completed the second phase of reconstruction of Tula brick factory, which was carried out over two years and included an entire range of engineering operations
31.07.2014
The «PLINFA» company has completed reconstruction of a brick plant «Boshan» LLP (Kazakhstan).
During reconstruction of preparation department of the plant PLINFA specialists have selected all necessary equipment for raw materials preparation, worked on its delivery and start-up. The key problem was that raw materials had lots of stony inclusions (5-7%), which didn’t allow processing bricks of a high quality and good appearance.
12.06.2014
The «PLINFA» company has completed forming head startup on the «BK STROYPROM» LLP (Kazakhstan)
The PLINFA Company has completed the universal forming head and mouthpiece startup for hollow and solid brick production at «BK STROYPROM» LLP (Kazakhstan).
1 2 3 4